1
|
Existing
system evaluation |
|
|
|
Air
velocity measurement at main duct |
|
|
|
Air
velocity measurement at each outlet |
|
|
|
Negative
pressure drop at each outlet |
|
|
|
CFM
calculation on the computer |
|
|
|
Possible
savings based on system calculations |
| |
|
|
2
|
Power
consumption, motor |
|
|
|
Motor
power (kW, kVA), voltage, current, power factor measurement |
|
|
|
Motor
evaluation (producer, insulation evaluation, efficiency,
how old is motor) |
|
|
|
Motor
compatibility with inverter |
|
|
|
Overload
protection evaluation, control box evaluation (control
of bag house, how they start and stop system) |
|
|
|
Power
system evaluation (voltage, phase, grounding) |
|
|
|
Power
utility company: utility account, rate schedule, electric
usage, electric peak |
|
|
|
Incentive
evaluation: large or small business, incentive availability
|
|
|
|
Working
hours evaluation: per day, per week, per year, holidays,
inventory, irregularity,... |
| |
|
|
3
|
Layout
of the existing system |
|
|
|
Layout
of the existing facility (computer CAD drawing) |
|
|
|
Workstation
numbering, outlets layout |
|
|
|
Fan
placements, power distribution placement |
|
|
|
Duct
system layout |
| |
|
|
4
|
Project
of ECOGATE System |
|
|
|
Changes
in ducting system (YES/NO), layout, eliminating some
fans proposals |
|
|
|
Placement
of new equipment (computer, inverter, blast gates, sensors,
cables) |
|
|
|
Cable
list, length of cables calculations, placement of cables |
|
|
|
Placement
of negative pressure sensors |
|
|
|
Selecting
the type of control computer, types of inverters |
|
|
|
Sensor
types selection, how they will be installed, connection
to workstation |
|
|
|
Selecting
blast gate types for each workstation, placement of
the blast gates |
|
|
|
Existing
hydraulic blast gate evaluation |
|
|
|
At
CNC machinery: based on existing documentation determine
connection to CNC computer |
|
|
|
Power
installation schematic diagram |
|
|
|
Low
voltage installation schematic diagram |
|
|
|
Type
of mechanical lift needed for installation (scissor
type, other type) |
|
|
|
Working
schedule: holidays, weekends, permission to work over
time |
|
|
|
Computer
calculation for ECOGATE System setup |
|
|
|
ECOGATE
System maintenance table |
|
|
|
Contact
persons at customer site (work permission, electrical,
facility manager) |
| |
|
|
5
|
Quotation |
|
|
|
Cost
of power installation |
|
|
|
Cost
of low voltage installation |
|
|
|
Cost
of blast gate installation |
|
|
|
Cost
of other services |
|
|
|
In
case of ducting change, cost evaluation |
|
|
|
Cost
of the hardware (computer control, inverters, blast
gates, sensors) |
|
|
|
Quotation,
based on real cost |
|
|
|
Savings
calculation based on real numbers |
|
|
|
Power
company incentive calculation |